An industrial firewall at each plant, at cost with no markup, installed and documented. Anything else the assessment turns up is quoted. Most of it is grant-eligible.
Two to six weeks, scheduled around your operations
▸A second step to log in, on every way into the plant from outside.
▸Shared logins replaced with individual accounts, and old ones closed.
▸The plant network separated from the office network.
▸Vendor and integrator access documented, with an off switch.
Billed annually. Monthly is $415 a plant and costs more over the year. For one or two plants the annual price stays under the $10,000 purchase threshold, so it is one signature instead of twelve invoices.
Annual term, renews on your say-so
▸Monitoring sized for a plant your size, with alerts routed to a person.
▸A quarterly review, and a call whenever something changes.
▸Backup restores tested on a schedule, not assumed.
▸Documentation kept current, so the next survey or renewal is already answered.
Step one has a set price because the job is the same every time. Steps two and three are quoted from what
the assessment finds.
Step 1 · Assess
What's driving this?
It is the same assessment and the same price whichever you pick. What changes is who the
paperwork at the end is written for: the inspector, the underwriter, the board, or a
grant application. Not sure? Take the first one.
Who does the work
A method built on 500+ live plants.
Written by a founding contributor and editor of ISA/IEC 62443, with twenty-five years inside live plants. A
senior control-system engineer signs off on your report before it goes out.
Step 3
Pay for it.
Total Fixed. No hourly billing, no change orders.
Would you rather your own IT provider handled this? If they're certified
with us they can sell and deliver it themselves. If they're not,
send them here and we'll get them certified.
Got a question first? Talk to an engineer.
877.387.7733, 7–6 CT, M–F.
Fixed price by size: small system $2,900 · mid-size system $4,900 · large system $17,900